Duck shelter, part 3: Raising the frame

Finally time to start putting up some timber framing components on location

video
August 2026 · 1 min read
Duck shelter, part 3: Raising the frame

Some joinery details left on the second wall to finish before I carry the components down from the barn and start final assembly.

Off camera I had also done more site work. Replaced some of the concrete plinths with an entire cinder block wall for the lower wall.